Application of Composite Fuzzy Neural Network Theory in Construction Engineering Cost
Abstract
To estimate construction engineering cost rapidly and accurately is very important for construction enterprises. Traditional methods use construction quota to calculate building cost, which need too much manual labor and time but can’t satisfy the demand of enterprises. Because the cost of civil engineering in China need to controlled dynamic. In this paper, on the foundation of information of construction cost estimation, fuzzy mathematical method is utilized to deal with the factors which affect the construction engineering cost, neural network’s method is introduced, then the fuzzy neural network estimation model was put forward. An example shows that using the methods to estimate the cost of construction is convenient, quickly and accurately, and the model have high value in practice.
Full Text:
PDFReferences
Aminuddin A.b.G.,Azamathulla H.M.(2011),Gene-expression programming for sediment transport in sewer pipe systems,Pipeline systems Engineering and Practice,2(3),102-106
AnS.H.,KimG.H.,Kang K.L.(2007).A case-based reasoning cost estimating model using experience by analytic hierarchy process, Building and Environment, 42(7), 2573-2579
Dybowski R., Roberts S.J. (2012).Confidence intervals and prediction intervals for feed-forward neural networks, Clinical applications of artificial neural networks, Cambridge University press, 138(6),679-687.
Feng W.M.,Cao Y.J.,Ren H.(2003),The Study on The Case-Based Reasoning Method of The Cost-Estimation in Civil Engineering, China Civil Engineering Journal, 36(3), 51-56. Doi:10.15951/j.tmgcxb.2003.03.012.
Hong J., Gao P.(2008).To Study on Fuzzy Recognition in Estimating Engineering Price, Value Engineering, 12(9), 126-129.Doi:10.14018/j.cnki.cn13-1085/n.2008.09.011.
Ismaail E.,Hossam H. (2011). A Neural network Model for Construction Projects Site Overhead Cost Estimating in Egypt. IJCSI International journal of computer science issues,8(1), 1694-1704.
Jiang Z.Q.(2008). Research on the Rapid Predicting Model for the Pre-estimated Investment in Railway Construction Project Based on Fuzzy Mathematics, Journal of Railway Engineering Society ,12(7), 107-110.Doi: 1006 -2106(2008)07 -0103 -04.
Karshenas,S.P.(2004).Cost-Estimating Method for Multistory Buildings, Journal of construction engineering and management, 10(1),79-86
Long L.(2008).To Applying on Fuzzy Analog Method in Project Cost Estimation, Value engineering, 12(7),153-155. Doi: 10.14018/j.cnki.cn13-1085/n.2008.07.001.
MitchellZ.,HildrethJ.,VorsterM.(2011).Using the Cumulative Cost Model to Forecast Equipment Repair Costs:Two Different Methodologies, Construction Engineering and Management, 137(10), 817-822.
PetrousatouK.,GeorgopoulosE.,LambropoulosS.,Pantouvakis J.P. (2012).Early Cost Estimating of Road Tunnel Construction Using Neural Networks,Construction Engineering and Management, 138(6),679-687.
Pourmahmoud N.,Hasanzadeh A.,Rafiee S.E,Rahimi M.(2012). Three dimensional numerical investigation of effect ofconvergent nozzles on the energy separation in a vortex tube,International Journal of Heat and Technology,30(2),133-140.
Qin Y.P,Kong S,Liu W.(2015).Dimensionless analysis of thetemperature field of surrounding rock in coalface with a finite volumemethod, International Journal of Heat and Technology,33(3), 151-157. Doi: 10.18280/ijht.330323.
Sae-Hyun J.,Moomseo P.,Hyun-Soo L.(2012),Case Adaptation Method of Case-Based Reasoning for Construction Cost Estimation in Korea,Construction Engineering and management,138(1),43-52.
Seokyon H.(2011),Time Series Models for Forecasting Construction Costs Using Time Series Index, Construction engineering and Management, 137(9),656662
SungjooH.,MoonseoP., Lee H.S,(2012).Automated Time-Series Cost Forecasting System for Construction Materials, Construction Engineering and Management,138(11), 1259-1269
Tang J.(2008).Estimating System of Construction Project Cost Based on Dynamic Fuzzy Neural Network, Journal of Hunan City University,17(4),63-66.
Wilmot. (2005).Neural network modeling of highway construction costs, Journal of construction engineering and management, 124(3), 210-218.
Yu J.,Liu J.M.(2007). The Fast Dynamic Algorithm of the Cost of Construction Based on Fuzzy Mathematics, Journal of Guangdong University of Technology, 24(2), 107-110
Refbacks
- There are currently no refbacks.

Revista de la Facultad de Ingeniería,
ISSN: 2443-4477; ISSN-L:0798-4065
Edif. del Decanato de la Facultad de Ingeniería,
3º piso, Ciudad Universitaria,
Apartado 50.361, Caracas 1050-A,
Venezuela.
© Universidad Central de Venezuela